Wednesday, 08 August 2012 16:52 |
We've finished pouring the ground floor slab in Sydney and are now in the process of pouring the columns for level 1 ahead of time. The formwork for the columns and the level 1 slab were installed at the same time but generally the columns are poured first.
In the top photo you can see a long red arm. This structure pours the concrete into the yellow column formwork which works as a mould. This formwork runs all the way from the ground up to the level 1 slab.
After the rain held up the build earlier in the year, we're over the moon to be making up some time.
Here you can see the newly finished ground floor slab. Next stop level 1!
|