S1 - Ground Level Almost Finished |
|
Friday, 03 August 2012 14:15 |
The ground floor slab at the western end of the property is nearly completely poured and we're preparing to continue the pour at the eastern end of the site.
This top photo is the first photo we've shown you that really gives you an idea of the enormity of the build in Sydney. The formwork you can see in the foreground is the eastern end of the site which is nearly ready to poured. Behind that you can see where we've almost finished the western end pour.
The gap you can see in the formwork here is for the precast concrete walls for the DRUPS rooms which will be lifted into the lower ground level of the data centre early next week. This area surrounding the gap is being poured right now!
As we did with the lower ground level pour, we have been erecting formwork as we pour the ground level ready to begin the level 1 slab in the coming weeks. The weather has been great over the last couple of weeks and we're hoping it stays the same so we can keep this momentum up.
|